Repair and Maintenance Work for Multi-Purpose Child and Adolescent Center in Camp-15, Block- D3, E9, E15, H7, F7, G3, G11 Ukhiya, Cox’s Bazar

 

       Good Neighbors is an international humanitarian development NGO founded in South Korea in 1991. Good Neighbors Bangladesh (GNB) was registered as an international non-government organization (INGO) with the NGO affairs bureau of the government of Bangladesh and commenced its operation in August 1996 for helping deprived children, their mothers and families through education, health services, economic security, protection, community development, sanitation, and disaster relief projects.

 

Article 1: (Purpose)

1-1. Good Neighbors Bangladesh invites tenderer for the Repair and Maintenance Work for Multi-Purpose Child Adolescent Center in Camp-15, Block- D3, E9, E15, H7, F7, G3, G11; Ukhiya, Cox’s Bazar as Emergency support.

 Article 2: (TENDER Enlist Application)

2-1. Companies that wish to participate in the TENDER should submit and apply to GNB with the following documentations.

Ø  TENDER Application and BOQ

Ø  Up-To-Date Trade License

Ø  Up-To-Date Income Tax Certificate

Ø  Vat Registration Certification

Ø  Update Bank solvency Certificate (minimum 25 Lakh)

Ø  Previous constructions documents / List of clients (up to 2.5 years)

Ø  Brief profile

Ø  Experience Certificates (Must have minimum three certificate above 25 lakh taka)

Ø  Any others relevant papers

 

 Article 3: (Submission TENDER Documents)

3-1.          Download the tender documents from GNB official webpage: www.gnbangla.org

3-2.          TENDER application should be submitted at our head office by Email address in PDF Format.

Email address: procurement@gnbangla.Org before the submission deadline (5th May 2024).

3-3.       The vendors have to visit the spot physically before prepare & submission quotation & send spot visiting 2 pictures as proof (Sample copy should attached with application).

3.4.                     Make sure, that the quotation amount will be binding between to 1-2 % less than tendering amount.

3.5.                    Those documents have to mail or arrive at the Good Neighbors Bangladesh” Head Office Address- Plot # 05, Block # A, Swadesh Shornaly Abashan, Purbanchal Express Highway, Barua, Khilkhet, Dhaka – 1229 before the day of Tender submission deadline is in effect.

Note: Every page must have the signature of Vendor in PDF copy. No need to worry if need to send more than one email including all required documents please send several times to us.

 

Article 4: (Validity of Competitive tender)

4-1. GNB will award the contract to the tenderer (The number of tenderers will be decided by GNB) for Repair and Maintenance Work for Multi-Purpose Child Adolescent Center in Camp-15, Block-  D3, E9, E15, H7, F7, G3, G11; Ukhiya, Cox’s Bazar as Emergency support.

If GNB decides to appoint more than one tenderer, the lowest tenderer will be prioritized and other selected tenderers will be offered to agree on the quoted lower rate or decided by the committee and they will get the award on the contract based.

 

4-2. If we found the same rate from different tenderers the selection process will be gone through lottery among the tenderers or the committee will be decided.

 

4-3. The tenderers whose quoted amount is lowest and reasonable with GNB estimated cost will be eligible for the tender or the committee will decide.

 

Article 5: (The Scope of the Repair and Maintenance works)

5-1. Project Purpose: Repair and Maintenance Work for Multi-Purpose Child Adolescent Center in Camp-15, Block-  D3, E9, E15, H7, F7, G3, G11; Ukhiya, Cox’s Bazar as Emergency support.

Article 6: (Bidding Amount Open)

6-1. The tenderers whose quoted amount is lowest and most reasonable with GNB estimated cost will be eligible for the tender, and the committee will be decided.

 

Article 7 (tender Cancellation)

In the event of a tender procedure’s cancellation, Tenderers will be notified by GNB.

Cancellation may occur where:

7-1. If the organization has to face any unavoidable reasons, the tender should be canceled before notification of the winning tenderer selection.

7-2. GNB has the right to eliminate any tenderer without showing any reason. So, Tenderers are not entitled to claim damages against the ordering authority when the Tender is canceled.

7.3 Tenderers are expected to examine carefully and comply with all instructions, forms, provisions and specifications contained in this TENDER PACKAGE.

7-4. Failure to submit tender containing all the required information and documentation within the deadline specified will lead to the rejection of the tender.

7-5. Who does not follow the Article No.3 will be treated as disqualified.

7-6. GNB has zero tolerance regarding any political and repugnant references or corrupted mentality.

7-7.  Power to accept part of a contract: GNB reserve the right, unless the tenderers expressly stipulates to the contrary in the tender, to award batches separately or in any combination.

 7-8. Tender Process: Any attempt by a tenderer to influence the evaluation committee in the process of examination, clarification, evaluation and comparison of tenders, to obtain information on how the procedure is progressing or to influence GNB in its decision concerning the award of the contract will result in the immediate rejection of his tender. All kinds of tendering processes will be completed by GNB’s Procurement Committee, and they have the right to cancel any tender for any reason.

7-9. Ownership of tender: GNB retain ownership of all tenders received under this tender process. Consequently, tenderers’ have no right to have their TENDER’s returned to them. GNB guarantees that tender offers shall remain confidential.

7-10. Notification award and contract signature: The successful Tenderers will be informed by email and over phone that their tender has been chosen (notification of award). The unsuccessful Tenderers will be informed by e-mail within the 15 days following the award.

Within 2 working days following the reception, the successful tenderers will sign, date and send back the contract. The selected tenderers will have to communicate the number and exact references of the bank account where the payments will be executed.

If the successful Tenderers fails to sign and send back the contract within 2 working days, UNICEF and its partners can consider (after notification) the award as null and void.

7-11. Type of contract: The contract that will be concluded between the successful tenderers and GNB is done according to standard contract.

By submitting an offer to this Invitation to tender, the Tenderers accepts contract terms. If any remark or reserve were to be raised by the tenderer, they should be clearly written down in a free format document included in the tender. Such documents should include the tenderer’s proposal to replace the discussed sections of the contract.

7-12. Good Neighbors Bangladesh concerned about the right of children and women and has “ZERO TOLERANCE” policy for any kind of sexual exploitation and abuse.

7-13. Only GNB has the right to amend, edit, and revise on the tender. There is no way to amend, edit, and revise for vendors.

 

Article 8: (Submission Deadline)

8-1. Tender relevant documents proving the eligibility of tenderers shall be submitted within the deadlines set out in the tender announcement or bidding notice.

8-2. Document submission deadline is meant to the Date (5th May, 2024) and time (5:00pm) of the tender deadline.

 Article 9: (Detailed Construction)

9-1. Winning tenderer shall conduct the Repair and Maintenance works contracts at the same time.

9-2. The detailed Repair and Maintenance works period will be 30 Days from the signing of work order.

9-3. The details full Repair and Maintenance works period will be included in the building completion date.

9-4. The Company who gets the tender work orders of construction total cost will be paid in after completion of 100% work, Payment system after supervision of construction works by GNB staffs. Payment will be made by account payee cheque.

9-5. VAT should be clear before the final bill submission.

9-6. The Company who gets the tender work orders will be deducted minimum 5% from total budget amount as penalty if they cannot complete the work on time and any damages that delay the flow of work caused by tenderer. No consideration for extension of time.

 

 Article 10: Cost and Currencies of Tender

10-1. The Tenderer shall bear all cost associated with the preparation and submission of his tender and GNB will in no case be responsible or liable for those costs.

10-2. The unit rates and amount shall be quoted by the tenderer entirely in BDT including Profit, Vat & Tax.

10-3. The unit rates and prices shall be quoted by the Tenderer entirely in the BDT-local currency.

 

 

      GNB maintains zero tolerance approach for all forms of sexual exploitation and abuse (PSEA). Stakeholders must be concerned about issues such as child rights, PSEA, and safety. If any of the stakeholders violates the PSEA policy, a child rights issue, or a safety issue, GNB has the right to terminate the contract immediately.